← Back to results

Integrated Master Scheduler

Join Saronic Technologies as an Integrated Master Scheduler to oversee the development and maintenance of shipyard schedules for new construction vessels.

Location
Franklin, LA
Compensation
Not disclosed
Level
mid
Type
full time · On-site

Posted by employer 5 days ago

First seen on Joblaze 4 days ago

Last verified on the company career page 6 hours ago

What you'll build

  • Develop and maintain the Integrated Master Schedule
  • Integrate major hull milestones into a portfolio-level forecast
  • Model vessel sequencing through major production stages
  • Evaluate portfolio scenarios for vessel starts and resource allocation
  • Develop weekly and monthly portfolio schedule reports

Must have

  • Bachelor's degree in Engineering, Construction Management, Business, or related field
  • 5–8 years of planning/scheduling or project controls experience
  • Advanced proficiency in Primavera P6 or similar scheduling software
  • Strong command of critical path method (CPM) scheduling
  • Proficiency with Microsoft Office, particularly Excel
  • Experience maintaining an integrated master schedule

Nice to have

  • Familiarity with capacity planning and shared-resource management
  • PMI-SP, AACE PSP, or similar scheduling/project controls certification

Requirements

Experience
5–8 years
Education
Bachelor's degree

Not disclosed in this posting: compensation, visa sponsorship.

Benefits

401k Match Life and Disability Insurance Time off Dental and Vision Insurance Equity/Stock Options Additional Perks Health Insurance Pet Insurance Competitive salary Parental Leave

Joblaze summary

The Integrated Master Scheduler at Saronic Technologies plays a crucial role in developing and maintaining the Integrated Master Schedule (IMS) for multiple new-construction vessels, ensuring alignment across various production milestones and resource allocations. This position requires advanced skills in Primavera P6 and a strong understanding of critical path method scheduling, making it suitable for candidates with significant experience in planning and project controls, particularly in shipbuilding or complex fabrication. The role demands a detail-oriented individual who can navigate the complexities of vessel sequencing and resource management in a dynamic shipyard environment.

Joblaze insights

  • Listed 4 days ago — first seen on Joblaze September 23, 2026. Last confirmed on Saronic Technologies's careers page September 27, 2026.

Quick facts

Is the Integrated Master Scheduler role remote?
No — this is an on-site role in Franklin, LA.
How much experience is required?
5–8 years of relevant experience for this Integrated Master Scheduler role.
Where is the role based?
Saronic Technologies is hiring for this position in Franklin, LA.
What seniority level is this role?
Saronic Technologies targets mid-level candidates for this position.
Is this full-time or contract?
Full-time for this Integrated Master Scheduler role at Saronic Technologies.

From the original posting

Job Overview

The Integrated Master Scheduler is responsible for the day-to-day development,

maintenance, analysis, and publication of the shipyard's Integrated Master Schedule (IMS)

across all active and planned vessels. The IMS provides the portfolio-level forecast for

major vessel milestones, vessel sequencing, shared resources, production capacity,

facility constraints, and conflicts across the orderbook. The Scheduling & Planning

Manager retains overall accountability and approval authority for the portfolio schedule.

Responsibilities

• Develop and maintain the Integrated Master Schedule covering all active and

planned new-construction vessels at the Franklin, Louisiana shipyard location.

• Integrate major hull milestones from detailed vessel schedules into a consistent

portfolio-level forecast.

• Maintain common WBS, activity coding, calendars, milestone definitions, data

dates, and schedule interfaces across the portfolio.

• Ensure vessel schedules and the IMS reconcile each update-cycle and that hull-

level milestone movement is visible in the site forecast.

• Model vessel sequencing through major production stages, facilities, and

constrained resources.

• Maintain logic for shared facilities and resources such as jigs, cranes, paint areas,

launch positions, test equipment, specialist labor, and other capacity-limited

assets.

• Identify conflicts between vessels, trade stacking, workspace congestion, resource

contention, and unachievable capacity assumptions.

• Evaluate portfolio scenarios and what-if alternatives for vessel starts, phase

transitions, facility occupancy, and resource allocation.

• Support management decisions on production priorities, vessel sequencing,

recovery strategies, and capacity requirements.

• Serve as day-to-day custodian of configuration, schedule logic, calendars,

baselines, data dates, forecasting, and schedule calculations.

• Perform portfolio-level critical and near-critical path analysis, float review,

milestone variance analysis, and schedule performance trending.

• Execute schedule variance and Schedule Performance Index (SPI) analysis where

applicable and develop milestone bar charts, S-curves, progress curves, and

exception reports.

• Review open ends, invalid logic, negative float, excessive float, lags, constraints,

out-of-sequence progress, and calendar assignments each update cycle.

• Allow valid logic and remaining duration to drive forecast dates rather than manually

moving activities to preserve desired milestones.

• Develop weekly and monthly portfolio schedule reports, milestone dashboards,

critical-path summaries, executive summaries, and recovery-option analyses.

• Present schedule exceptions requiring priorities, resources, or management

decisions.

• Maintain schedule change, delay/risk, decision/action, and milestone-variance

records in accordance with established controls.

• Maintain the standard vessel schedule architecture, common milestone definitions,

interface points, coding, and duration-history framework.

• Incorporate approved lessons learned from completed and repeat hulls into

standard planning templates.

• Support development of historical schedule and productivity data for future

estimating, capacity planning, and production forecasting.

• Partner with Vessel Planners to improve forecast quality without taking ownership

away from the detailed hull schedules.

Qualifications

  • Bachelor's degree in Engineering, Construction Management, Business, or a related field, or an equivalent combination of education and relevant experience.

  • [5–8]+ years of planning/scheduling or project controls experience, including integrated or master schedule ownership, preferably in shipbuilding, marine, or complex fabrication environments.

  • Advanced proficiency in Primavera P6 or similar scheduling software, including multi-project integration and resource- and/or cost-loaded schedules.

  • Strong command of critical path method (CPM) scheduling, earned value concepts, and schedule performance metrics (SV, SPI).

  • Proficiency with Microsoft Office, particularly Excel, for reporting and data analysis.

  • Experience maintaining an integrated master schedule across multiple concurrent new construction vessels or similarly complex programs.

  • Familiarity with capacity planning, facility/berth constraints, and shared-resource management across a portfolio.

  • PMI-SP, AACE PSP, or similar scheduling/project controls certification.

Physical Demands

  • Prolonged periods of sitting at a desk and working on a computer

  • Occasional standing and walking within the office

  • Manual dexterity to operate a computer keyboard, mouse, and other office equipment

  • Visual acuity to read screens, documents, and reports

  • Occasional reaching, bending, or stooping to access file drawers, cabinets, or office supplies

  • Lifting and carrying items up to 20 pounds occasionally (e.g., office supplies, packages)

Saronic pays 100% of the premium under the basic plan for employees and 80% for dependents

Time Off: Generous PTO and Holidays

Retirement Plan: 401(k) plan with company match

Stock Options: Equity options to give employees a stake in the company’s success

Pet Insurance: Discounted pet insurance options including 24/7 Telehealth helpline

Standard company text repeated across Saronic Technologies's postings is omitted here.

Similar positions

Saronic Technologies
Materials Supervisor
Saronic Technologies · Franklin, LA
SpaceX
Sr. Scheduler (Starship)
SpaceX · Starbase, TX
Saronic Technologies
Senior Program Coordinator, Mission Operations
Saronic Technologies · Austin, TX
SpaceX
Sr. Scheduler (Starship)
SpaceX · Starbase, TX
Saronic Technologies
Materials Supervisor
Saronic Technologies · Austin, TX